After the successfully commissioned project with 1 MW capacity in Evros Region, another 500 kWp project was connected to the grid in the last month.
In the project, which was completed in Isaakio near Didimoticho, Evros, 20 DEGER S100-SR single axis trackers were installed. Of these, 18 trackers are carrying 66 solar modules, while the other 2 are carrying 56 solar modules each with 385 Wp power.